My entry is up. I have designed my fort around the idea of dwarves living on one side of the river and working on the other.
The five projects are as follows:
1 Bauxite Bridge, not exactly very interesting but it does go through a nice waterfall to keep the dwarfs happy and clean.
2 Circular tower, 13 stories high and has a flood system to drown any enemies who want to approach my fort from this side of the river.
3 Circular living area, The area from the first layer of bedrooms down through a legendary 2 story dining area ending at the bottom z-level with the dwarven crypts. Keeps with the circular theme of the above tower.
4 Dwarven steam paddler and dock, The steam powered boat ready to set sail into the river (If you can use your imagination a little.) It even has an engine boiler with improvised waterwheel as turbine and two ballista. The boat was supposed to be all wood with stone chimney but I didn't have enough time so I had to use some schist which has the same color as wood. Still over 200 blocks of wood in there though.
5 Workshop side, The work/farm area for the dwarves defended by a 3 z-level high wall. Also include the road and trade depot in this project.
Every dwarf has a 3x3 room, a cabinet and a coffer. - A_Fey_Dwarf
There are 2 comments for this map series, last post 2009-07-14
AFD's Rivercross entry
No related entries found.
SHIFT + Key doubles keyboard scroll rate.
Don't have Flash?
You can download the compressed map file:
2009-07/a_fey_dwarf-Rivercross-DF Masters R1 (Rivercross)-1005-2.fdf-map
but you will need the .NET version of
SL's DF Map Compressor
to convert to the .PNG image format.
Submitted by: Meta - 2009-07-14 to 1005 Early Spring
The tower is really great and the steamer is a good idea.
I don't like the defended workshop area. An underground one may have looked better.
Why didn't you continue the road on the other side? It could have been great.
Submitted by: crash2455 - 2009-07-14 to 1005 Early Spring
Yeah, that paddle steamer's really cool. You should post a 3Dwarf image.