Two years have past and the temple is about to receive its first sacrifice of 156 lives. Construction of the artifical lake has begun as well. The housing project are just waiting for the construction of windows before the indoor water works are turned on.
While not truly a sewer, it will provide the water necessary for the housing. The water comes in from the artifical lake 1z level below the dining area. When it rises to fill level 6 hour hatches open to send the waterfalls down to the lowest z level. Part of that water is then pumped into the sewers. When full the sewers power will be activated and it will be pumped into the housing sections above. Controlled by pressure plates there should be a continual flow of water. - Zaltanek
The HTML5 map viewer is currently in Alpha mode - I'm actively trying to develop new functionality.
There should be many very obvious problems with the viewer; please check
the
Issues page to notify or comment on the most egregious problems to help
me prioritise. The most common will be Loading... with an error
in the browser developer tools console. e.g. RangeError: Offset is
outside the bounds of the DataView
. Feel free to
report a problem
with a link to the problematic map or point of interest.
Inkyconstructs
SHIFT + Key doubles keyboard scroll rate.
Don't have Flash?
You can download the compressed map file:
2009-04/zaltanek-Inkyconstructs-region2-win-202-206-26961.fdf-map
but you will need the .NET version of
SL's DF Map Compressor
to convert to the .PNG image format.
Submitted by: ClsfdKidd - 2009-03-27 to 204 Early Summer
Dude, this is looking very nice indeed. Bravo!
Submitted by: Stromko - 2009-03-28 to 204 Early Summer
Wow you're really going full-bore with the circular designs and patterns. Very inspiring!
Submitted by: Zaltanek - 2009-05-01 to 209 Early Spring
While not exactly 178 waterfalls, it does provide a waterfall to 178 rooms.
Submitted by: Unbeltedsundew - 2011-01-25 to 209 Early Spring
Oh man... this is awesome. Why hasn't it got more attention?