Displaying results 1 to 1 of 1 (Page 1)
« Prev | 1 | Next »
Sort by: Author, Date Submitted (Clear Search) | |
---|---|
Map: Underground Preview - 2 | Toady One |
« Prev | 1 | Next »
Sealing the Chamber (The Plan)
A breach shall be made between the currently disused well channel into the magma chamber releasing water onto the magma with the intent of cooling it into obsidian and sealing the opening allowing workers entry to the area to build around it
As a secondary objective, reconnecting this currently stagnant pipeline with the brook to the north would greatly improve the drinking options to my dwarfs so my aim is to control the water using a lever that alternates 2 floodgates changing the waters direction -
Benny